WBUT 2013 INDUSTRIAL MANAGEMENT(HU-802) QUESTION PARER

Submitted by Anonymous (not verified) on Thu, 07/10/2014 - 18:20

CS/B.TECH/CSE/IT/EE/EEE/ICE/CT/SEM-8/HU-802/2013
2013
INDUSTRIAL MANAGEMENT

Time Allotted : 3 Hours                                                                                            Full Marks : 70

The figures in the margin indicate full marks.
Candidates are required to give their answers in their own words
as far as practicable.
GROUP – A
( Multiple Choice Type Questions )


1. Choose the correct alternatives for any ten of the following :
                                                                                                                                               10 × 1 = 10
i) Job Shop Production is characterized by
a) manufacturing of one or few quantity of products designed and produced as per customer's specification within prefixed time and cost
b) a form of manufacturing in which the job passes through the functional departments in lots
c) where the product and process standardization exists and all outputs follow the same path
d) where the production facilities are arranged as per the sequence of production operations from the first operations to the finished product.

ii) Control chart for variables is
a) Fraction Defective Chart (p-chart)
b) Range Chart (R-chart)
c) Number of Defects Chart (c-chart)
d) none of these.

iii) FSN analysis is required to control
a) quality of the product          b) inventory

 

Comments

Related Items

WBUT 2012 Electrical and Electronic Measurement [EE-402] Question Paper

WBUT 2012 Semester Question Paper for ELECTRICAL AND ELECTRONIC MEASUREMENT. This Paper is currently included in the syllabus of Electrical Engineering (EE) brancn in 4th semester(2nd year-2nd sem).

GATE 2013 Question Paper for Electrical Engineering (EE)

GATE 2013 Question Paper for Electrical Engineering (EE). Download Question Paper and answer key.