WBUT 2013 ELECTRICAL EQUIPMENT IN POWER GENERATION, TRANSMISSION AND DISTRIBUTION Question Paper Code [CS/B.Tech/(PWE-NEW)/SEM-6/PWE-604/2013]

Submitted by Anonymous (not verified) on Thu, 07/31/2014 - 12:30

CS/B.Tech/(PWE-NEW)/SEM-6/PWE-604/2013

2013

ELECTRICAL EQUIPMENT IN POWER GENERATION,

TRANSMISSION AND DISTRIBUTION

Time Allotted : 3 Hours                                Full Marks : 70

The figures in the margin indicate full marks.

Candidates are required to give their answers in their own words

as far as practicable.

GROUP – A

( Multiple Choice Type Questions )

1. Choose the correct alternatives for any ten of the following :

10x1 = 10

i) Purging of H 2 gas inside the Turbogenerator is done by

a) Compressed air b) CO2 gas

c) N2 gas d) all of these.

ii) The complete bearing is insulated from foundation/end

shield to

a) prevent flow of shaft current

b) improve the mechanical strength

c) allow gas passage

d) control the temperature.

iii) At underexcited condition, which part of the generator

gets overheated ?

a) Overhang portion of stator winding

b) Overhang portion of rotor winding

c) Retaining ring portion

d) All of these.

iv) Generator shaft seal oil pressure is kept

a) slightly higher than H2 gas pressure

b) slightly lower than H2 gas pressure

c) equal to H2 gas pressure

d) very higher than H2 gas pressure.

v) In ESP, collecting electode ( i.e. collecting plate ) is

a) positively charged and earthed

b) negatively charged and earthed

c) earthed only

d) none of these.

Attchments

Comments

Related Items