CS/B.Tech-TT(NEW)/SEM-6/TT-602/2013
2013
FABRIC FORMATION-III
Time Allotted : 3 Hours Full Marks : 70
The figures in the margin indicate full marks.
Candidates are required to give their answers in their own words
as far as practicable.
GROUP – A
( Multiple Choice Type Questions )
1. Choose the correct alternatives for any ten of the following :
10X1 = 10
i) The sulzer projectile loom is a
a) multi-projectile loom
b) bi-projectile loom
c) mono-projectile loom
d) non-projectile loom.
ii) The machine used in stitch bonding is basically a
modified
a) warp knitting machine
b) sewing machine
c) weft knitting machine
d) needle punching machine.
iii) To obtain a closer pick spacing, in Sulzer projectile
loom the back rest is raised above its normal position
and the arrangement is called
a) shed splitting b) shed troughing
c) shed staggering d) shed matching.
iv) In a modern beat up mechanism a conjugate cam is