WBUT 2013 HVDC TRANSMISSION Question Paper Code [CS/B.TECH/PWE/SEM-8/PWE-804B/2013]

Submitted by Anonymous (not verified) on Thu, 07/31/2014 - 10:55

CS/B.TECH/PWE/SEM-8/PWE-804B/2013

2013

HVDC TRANSMISSION

Time Allotted : 3 Hours                             Full Marks : 70

The figures in the margin indicate full marks.

Candidates are required to give their answers in their own words

as far as practicable.

GROUP – A

( Multiple Choice Type Questions )

1. Choose the correct alternatives for the following :

10x1 = 10

i) Which system is not defined in an HVDC system ?

a) Monopolar

b) Bipolar

c) Unipolar

d) Homopolar.

ii) The longest existing HVDC link in the world is at

a) UK b) USA

c) Sweden d) China.

iii) HVDC transmission system is economical beyond

a) 200 km b) 300 km

c) 400 km d) 500 km.

iv) Overcurrent protection in HVDC system is

accomplished by

a) overhead shield wire

b) control valves

c) protective gaps

d) lightning arrester.

v) The longest existing HVDC link in India is

a) Rihand — Dadri

b) Talcher — Kolar

c) Chandpur — Phadge

d) Jaipur — Vishakhapatnam.